
Learn / The PSW Energy publication
Follow a question.
Find the detail that matters.
Keep exploring
New ideas. Practical answers.
A Western Australian point of view.
149 articles in the library · Page 12 of 13
Search the libraryAsk for the encapsulant and rear-cover materials used in the panel model on your quote, then check the warranty exclusions for labour and freight.
Compare panel output per square metre using the datasheet's temperature assumptions. Treat a NOCT-based estimate as a comparison tool, with local roof conditions assessed separately.
Read the articleSend your installer the Fronius state code and inverter model, with a note of when it appeared.
Read the articleIf you own Aleo panels, check whether your paperwork includes Aleo Partner Network cover. The replacement terms recorded in 2020 need to be matched to your installation.
Read the articleMicroinverters beneath the panels can add roof-access labour to an Enphase warranty claim. Check your original warranty documents for labour cover and any preferred-installer conditions.
Read the articleKeep your LG panel's original warranty documents when requesting support. Following LG's manufacturing exit, a replacement assessment needs to check electrical compatibility with the existing array.
Read the articleAsk your Fronius installer to confirm warranty registration and monitoring setup at commissioning, including who will handle service requests afterwards.
Read the articleQCells warranty terms need to match the panel model and installation paperwork. For older Q.Partner installations, confirm the cover that applied when your system was fitted.
Read the articleFor an older SMA inverter, check whether your installation paperwork includes PowerUP partner cover. The warranty extension described in 2020 should be confirmed against your own documents.
Read the articlePSW Energy's 2020 notice addressed restricted access to Jinko Tiger panels and included a distribution letter. Its supply arrangements and customer advice belong to that period.
Read the articleREC owners should check their installation records and confirm ProTrust cover with REC. Installer certification and labour cover were central to the warranty terms recorded when the panels were sold.
Read the articleWarranty enquiries start with the inverter model, serial number and installation date. Keep the supply and installation documents with those details when asking about cover.
Read the article