
Support/Reference guide/
Learn / The PSW Energy publication
Follow a question.
Find the detail that matters.
Keep exploring
New ideas. Practical answers.
A Western Australian point of view.
148 articles in the library · Page 11 of 13
Search the libraryFusionSolar reconnection starts with checking your home network and identifying the inverter. If login details fail or a connection fault persists, contact support before changing installer settings.
Meet the team responsible for aftercare before choosing an installer. A warehouse visit or a remote check can help you assess the business behind the quote.
Read the articleFind the WiFi connection details on the SMA type label before starting setup. Router pairing and the local web interface are reconnection options; Sunny Portal reporting needs a separate check.
Read the articleGrid import and export readings help you match appliance use to solar production, adding household demand to the figures in your monitoring app.
Read the articleFor Sungrow systems using a Wi-Fi dongle, iSolarCloud handles local network setup. Check signal strength at the inverter and have your home network details ready before reconnecting.
Read the articleKeep your Wi-Fi details ready for installation day and your handover documents where you can find them. Your project hub brings together the agreement and records from the work.
Read the articleWait for the Projects Support email before setting up your monitoring account. Contact support if the email has not arrived or needs to go to a different address.
Read the articleCheck the module’s temperature coefficient when comparing TOPCon panels for a hot roof. Rear-side generation claims also need weighing against how the panels will be mounted.
Read the articleRecord the SolarEdge error code and inverter model before contacting support. Optimiser faults may also need checking through monitoring to identify the affected unit.
Read the articleMatch Jinko’s product and performance warranties to your panel model, then check the installation documents before relying on the cover.
Read the articleIdentify your Growatt model before using a code table, because the reference separates older units from XH hybrids. Keep the code and its timing ready when contacting support.
Read the articleAsk for the encapsulant and rear-cover materials used in the panel model on your quote, then check the warranty exclusions for labour and freight.
Read the article