SMA inverter WiFi reconnect guide
Find the WiFi connection details on the SMA type label before starting setup. Router pairing and the local web interface are reconnection options; Sunny Portal reporting needs a separate check.
Learn / The PSW Energy publication
Follow a question.
Find the detail that matters.
The article library
Fault codes, monitoring dropouts and wifi reconnection, brand by brand. Written for the system in front of you.
57 articles in the library · Page 4 of 5
Clear filtersFind the WiFi connection details on the SMA type label before starting setup. Router pairing and the local web interface are reconnection options; Sunny Portal reporting needs a separate check.
Grid import and export readings help you match appliance use to solar production, adding household demand to the figures in your monitoring app.
Read the articleFor Sungrow systems using a Wi-Fi dongle, iSolarCloud handles local network setup. Check signal strength at the inverter and have your home network details ready before reconnecting.
Read the articleKeep your Wi-Fi details ready for installation day and your handover documents where you can find them. Your project hub brings together the agreement and records from the work.
Read the articleWait for the Projects Support email before setting up your monitoring account. Contact support if the email has not arrived or needs to go to a different address.
Read the articleRecord the SolarEdge error code and inverter model before contacting support. Optimiser faults may also need checking through monitoring to identify the affected unit.
Read the articleMatch Jinko’s product and performance warranties to your panel model, then check the installation documents before relying on the cover.
Read the articleIdentify your Growatt model before using a code table, because the reference separates older units from XH hybrids. Keep the code and its timing ready when contacting support.
Read the articleSend your installer the Fronius state code and inverter model, with a note of when it appeared.
Read the articleIf you own Aleo panels, check whether your paperwork includes Aleo Partner Network cover. The replacement terms recorded in 2020 need to be matched to your installation.
Read the articleMicroinverters beneath the panels can add roof-access labour to an Enphase warranty claim. Check your original warranty documents for labour cover and any preferred-installer conditions.
Read the articleKeep your LG panel's original warranty documents when requesting support. Following LG's manufacturing exit, a replacement assessment needs to check electrical compatibility with the existing array.
Read the article