Learn / The PSW Energy publication
Follow a question.
Find the detail that matters.
The article library
How storage gets sized, and which warranty terms are worth reading twice.
40 articles in the library · Page 2 of 4
Clear filtersFor staged SigenStack expansion, check the controller model against the proposed combiner box. Confirm compatibility in current manufacturer documentation before ordering hardware for a later storage addition.
Site layout and backup requirements matter when assessing the announced Fronius Reserva Pro. Confirm Australian approval and pricing before including it in a system design.
Read the articleAsk your installer to check the air conditioner’s starting load against the battery’s backup capacity on its phase. Have the quote identify which circuits will run during an outage.
Read the articleA package quote needs to account for your roof and switchboard. Ask for installation extras in writing, and check the rebate assumptions and export pathway before paying a deposit.
Read the articleYour existing inverter and solar output help determine the retrofit path. Check equipment compatibility and the circuits you want backed up before deciding what to keep or replace.
Read the articleSize a battery around evening use and backup needs. Tiered incentives affect the discount on extra capacity, so compare the additional cost with the electricity you expect to use.
Read the articleCount the existing inverter capacity and check Gateway compatibility before planning extra storage. Evening electricity use helps establish the need, and any rebate eligibility requires a site-specific check.
Read the articleThe archived Powerwall 3 offer covered orders placed by June 2026, with a separate installation deadline. Its reward-card terms should not be treated as a current offer for new orders.
Read the articlePowerwall 3’s Heat Mode warms cells for cold-weather charging. Consider your site’s winter conditions when comparing batteries, alongside the capacity and warranty you need.
Read the articleHave a licensed electrician confirm your supply type before choosing a two-phase Sigenergy setup. Check current manufacturer guidance for backup and generator compatibility.
Read the articlePSW Energy visited GoodWe’s Suzhou headquarters and a manufacturing facility in China. The team saw the building’s own energy systems and watched inverter and battery production.
Read the articleSigenergy presented changes to SigenStor Neo’s backup switching and cooling at its launch. Check the Australian product documents before using those claims to specify a system.
Read the article